The building
Station direction
Politecnico direction
There are two shops under the building. The first is closed and is expected to open a dental practice in its place, the second shop deals with cellular repairs, as well as being an Amazon and Wish delivery point.
Eat-in kitchen with oven, microwave, washing machine, dishwasher, refrigerator, large balcony and view of the Resegone.
Entrance
Disengage
Corridor
Kitchen
Rooms entrance
Rooms entrance
The apartment has been completely emptied and important architectural interventions have been made in order to make the rooms independent and provide them with dedicated services. Particular attention was paid to the false ceiling and insulation, as well as to design spaces and equipment suitable for students. The works started in May 2021 and delivered in mid-September 2021.